Building Status

Buildingsort descending Unit(s) in Building Project Manager Status APs Before APs After
1027 EAST HURON BUILDING VP for Development -- Substantial/Full Upgrade Complete 0 --
1032 GREENE BUILDING B&F - Plant Operations -- Substantial/Full Upgrade Complete 0 3
1580 ELLSWORTH ROAD University Library -- Infrastructure Design Underway 0 --
202 SOUTH THAYER BUILDING College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 2/19/16)
28 41
214 S STATE ST Graham Environ. Sustain. Inst. -- Substantial/Full Upgrade Complete 3 4
300 N INGALLS BUILDING UMHS Building Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
7 77
305 W LIBERTY College of Architecture & Urban Planning -- Infrastructure Design Underway
(U-M no longer occupies this building)
0 --
306 S STATE School of Art and Design -- Upgrade Deferred / Denied
(U-M no longer occupies this building)
0 --
523 SOUTH DIVISION BUILDING Office of Budget & Planning -- Proposed 0 --
555 SOUTH FOREST BUILDING College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete 3 12
625 E LIBERTY STREET Graham Environ. Sustain. Inst. -- Substantial/Full Upgrade Complete 1 3
715 E HURON Ctr for Inst Diversity -- Upgrade Deferred / Denied
(U-M no longer occupies this building)
--
717 E HURON Ctr for Inst Diversity -- Upgrade Deferred / Denied
(U-M no longer occupies this building)
0 --
ADMINISTRATIVE SERVICES B&F - ITS -- Substantial/Full Upgrade Complete 22 28
AERO ENG LAB PUMPING STATION College of Engineering -- Substantial/Full Upgrade Complete 0 2
AERO ENG POWER PLANT College of Engineering -- Substantial/Full Upgrade Complete
(Completed as part of Gorguze WiFi upgrade)
0 --
AEROSPACE ENGINEERING LAB PLASMA RESEARCH College of Engineering -- Substantial/Full Upgrade Complete
(Upgraded at same time as the Gorguze Family Laboratory)
0 7
AEROSPACE ENGINEERING LAB PROPULSION LAB College of Engineering -- Substantial/Full Upgrade Complete
(Upgraded at same time as the Gorguze Family Laboratory)
0 7
AEROSPACE ENGINEERING LAB WIND TUNNEL LAB College of Engineering -- Substantial/Full Upgrade Complete
(Upgraded at same time as the Gorguze Family Laboratory)
0 9
ALICE CROCKER LLOYD HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Upgrade completed as of 6/24/16 with exception of two APs intended to cover the exterior balcony (to be covered due to high density of students that gather here on a regular basis))
65 151
ALUMNI MEMORIAL HALL (MUSEUM OF ART) Museum of Art Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade included replacing existing APs with current Cisco models and reinforcing where able considering access, security and aesthetics.)
28 28
ANGELL HALL AUDITORIUMS College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade completed during week of 12/7/2015)
12 28
ANGELL JAMES B HALL AND TISCH HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade completed 11/5/15)
54 125
ANN AND ROBERT H LURIE BIOMEDICAL ENGINEERING BLD College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 25 42
ANN AND ROBERT H LURIE TOWER College of Engineering -- Substantial/Full Upgrade Complete 0 2
ANN STREET PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed 6 --
ARBOR LAKES 1 B&F - ITS -- Construction/Installation Underway 0 --
ARBOR LAKES 2 B&F - ITS -- Construction/Installation Underway 0 --
ARBOR LAKES 3 B&F - ITS -- Construction/Installation Underway 0 --
ARGUS BUILDING I VP Communications - Michigan Creative & Radio -- Substantial/Full Upgrade Complete 0 20
ARGUS BUILDING II B&F Risk Management -- Substantial/Full Upgrade Complete 0 6
ART & ARCHITECTURE BUILDING School of Art / CA&UP Leslie Williamson Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 1/15/16)
64 133
AUXILIARY SERVICES BUILDING 1 B&F - Print Copy Mail Administration -- Substantial/Full Upgrade Complete 7 38
AUXILIARY SERVICES BUILDING 2 B&F - Plant Operations -- Substantial/Full Upgrade Complete 0 1
BAITS VERA II ZIWET HOUSE University Housing -- Substantial/Full Upgrade Complete 29 31
BETSY BARBOUR HOUSE University Housing -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
12 57
BOB AND BETTY BEYSTER BUILDING College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade completed 5/19/16)
58 79
BONISTEEL INTERDISCIPLINARY RESEARCH BUILDING College of Engineering -- Substantial/Full Upgrade Complete 8 9
BOYER BUILDING B&F - ITS -- Substantial/Full Upgrade Complete 6 8
BURNHAM HOUSE Academic & Faculty Affairs -- Proposed 0 --
BURTON MEMORIAL TOWER School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
9 26
BUSINESS ADMIN EXECUTIVE DORM School of Business -- Substantial/Full Upgrade Complete 21 76
CARL A GERSTACKER BUILDING College of Engineering -- Substantial/Full Upgrade Complete 24 51
CARVER BUILDING - 506 E Liberty IRLEE -- Substantial/Full Upgrade Complete 2 10
CATHERINE ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
CENTRAL CAMPUS REC BLD STORAGE FACILITY Rec Sports -- Upgrade Deferred / Denied 0 --
CENTRAL POWER PLANT B&F - Plant Operations -- Construction/Installation Underway 0 65
CHARLES R JR WALGREEN DRAMA CENTER School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
23 62
CHEMISTRY & DOW WILLARD H LABORATORY College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 1/6/16)
163 382
CHRYSLER CENTER CONTINUING ENGINEERING EDUCATION College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 11/25/15)
19 45
CHURCH ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
COLISEUM Rec Sports -- Infrastructure Design Underway 0 --
COLLEGE OF PHARMACY BUILDING College of Pharmacy Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 2/3/2016)
5 44
COMMUNITY DENTISTRY School of Dentistry -- Substantial/Full Upgrade Complete 1 7
COMPUTER EXECUTIVE EDUCATION BLD School of Business Leslie Williamson Substantial/Full Upgrade Complete
(To be completed as part of construction project for Blau Hall. The
WiFi project will fund WiFi Access Point hardware and installation. Completion deadline extended due to state of contruction and need to cable some additional locations.)
18 74
COUZENS HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade completed 6/28/16)
81 212
CRAM PLACE COMMUNITY CENTER University Housing -- Proposed 2 --
DANA SAMUEL TRASK BUILDING SNRE Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade completed in June 2016 )
47 97
DANCE BUILDING School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Completed along with CCRB as part of Public Building WiFi)
0 6
DENTAL BLDG AND W K KELLOGG FOUNDATION INSTITUTE School of Dentistry Leslie Williamson Substantial/Full Upgrade Complete
(Project team will work with School of Dentistry staff to upgrade areas not expected to be impacted by construction project.
Project planning is underway including review of construction project(s) and building requirements. Wireless site survey to start on 10/10/16.
Meru APs replaced with new Cisco APs prior to full building upgrade.)
279 317
DETROIT OBSERVATORY Academic & Faculty Affairs -- Substantial/Full Upgrade Complete 2 3
EARL V MOORE BLDG School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Priority areas were upgraded in Summer 2016. These included the 1st floor practice rooms, auditoriums and 3rd floor faculty offices. Upgrade work on the remaining portions of the building was substantially completed on 9/27/16.)
17 145
EAST HALL College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
113 260
EAST QUADRANGLE University Housing -- Infrastructure Design Underway 165 --
EDWARD HENRY KRAUS BUILDING College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(Kinesiology & LSA will continue to use the building until fall of 2017, and at that time they will spend 6 to 8 months preparing for a full renovation of the building. Kinesiology is planning to include the WiFi implementation under the construction project, which is tentatively scheduled for completion late 2020 to early 2021. The Campus WiFi Upgrade Project replaced aging infrastructure (existing Meru APs were replaced with new Cisco APs) and key areas of the building were reinforced 7/14/16. )
85 90
ELECTRICAL ENGINEERING AND COMPUTER SCIENCE BLD College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade completed 6/1/16)
96 189
ELIZA M MOSHER HALL & MYRA B JORDAN HALL (MoJo) University Housing Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 6/20/16)
117 182
ENGINEERING RESEARCH BUILDING 1 College of Engineering -- Substantial/Full Upgrade Complete 28 42
ENGINEERING RESEARCH BUILDING 2 College of Engineering -- Substantial/Full Upgrade Complete 24 36
ENGINEERING RESEARCH SUPPORT BLD College of Engineering -- Substantial/Full Upgrade Complete
(Upgraded along with Auxiliary Services buildings [#2501 & #2502])
0 1
ENVIRONMENTAL AND WATER RESOURCES ENGINEERING BL College of Engineering -- Substantial/Full Upgrade Complete 18 36
FACILITIES SERVICES BUILDING A B&F - Plant Operations -- Construction/Installation Underway 5 --
FACILITIES SERVICES BUILDING B B&F - Plant Operations -- Construction/Installation Underway 9 --
FACILITIES SERVICES BUILDING C B&F - Plant Operations -- Construction/Installation Underway 3 --
FIRE SERV INSTR RES CENTER B&F - Facilities & Operations -- Proposed 0 --
FLETCHER HALL University Housing Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade completed 2/19/16)
8 19
FLETCHER ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
FORD NUCLEAR REACTOR College of Engineering -- Substantial/Full Upgrade Complete 0 23
FOREST AVE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
FRANCIS THOMAS JR PUBLIC HEALTH (SPH II) School of Public Health Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
44 207
FRANCOIS-XAVIER BAGNOUD BUILDING (FXB) College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 2/13/16)
39 69
GALLERIA BUILDING Provost's Office - ADVANCE -- Substantial/Full Upgrade Complete 0 9
GEORGE GRANGER BROWN MEMORIAL LABORATORIES (G G BROWN) College of Engineering -- Substantial/Full Upgrade Complete
(Completion of upgrade dependent on building projects.)
78 127
GLEN AVE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
GLENN E SCHEMBECHLER HALL Athletics -- Construction/Installation Underway 7 --
GORGUZE FAMILY LABORATORY College of Engineering -- Substantial/Full Upgrade Complete 31 27
HAMILTON SQUARE Confucius Institute -- Substantial/Full Upgrade Complete 0 4
HARRISON M RANDALL LABORATORY College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade; the number of access points nearly doubled during the upgrade due to building requirements.)
57 155
HAVEN HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade completed 11/5/15)
34 79
HEALTH MANAGEMENT RESEARCH School of Kinesiology Leslie Williamson Upgrade Deferred / Denied
(Upgrade on indefinite hold due to changes at HMRC)
0 --
HELEN H NEWBERRY RESIDENCE University Housing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
9 59
HENDERSON HOUSE University Housing -- Proposed 8 --
HENRY FRIEZE VAUGHAN PUBLIC HEALTH BUILDING (SPH I) School of Public Health Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
78 122
HERBERT H DOW BUILDING (DOW) College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 2/9/16)
36 95
HILL ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
HOOVER ANNEX B&F - Facilities & Operations -- Substantial/Full Upgrade Complete 0 2
HOOVER AVE HEATING PLANT B&F - Plant Operations -- Substantial/Full Upgrade Complete 0 3
HURON BANK (777 N. University Ave) School of Information -- Substantial/Full Upgrade Complete
(Upgrade completed as part of SI move-in activities)
0 2
HUTCHINS HALL Law School Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
48 96
INDUSTRIAL AND OPERATIONS ENGINEERING BUILDING College of Engineering -- Substantial/Full Upgrade Complete 55 61
INSTITUTE FOR SOCIAL RESEARCH ISR -- Substantial/Full Upgrade Complete 146 172
INSTITUTE OF CONTINUING LEGAL ED Continuing Legal Education Ins -- Substantial/Full Upgrade Complete 3 9
JAMES AND ANNE DUDERSTADT CENTER University Library Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade completed during week of 12/7/15)
43 125
JOAN & SANFORD WEILL HALL (FORD SCHOOL) School of Public Policy Dana Farrell Substantial/Full Upgrade Complete 39 57
JOHN P COOK BUILDING University Housing -- Substantial/Full Upgrade Complete
(Upgraded along with the Lawyers Club and Charles T Munger Residence)
27 57
JOHN P WEIDENBACH HALL Athletics -- Proposed 12 --
JOSEPH A & MARGUERITE K BURSLEY HALL University Housing Dana Farrell Substantial/Full Upgrade Complete
(Full upgrade completed Summer 2016)
216 318
KINESIOLOGY BUILDING School of Kinesiology -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
19 39
KRESGE BUSINESS ADMIN LIBRARY School of Business Leslie Williamson Substantial/Full Upgrade Complete
(To be completed as part of construction project for Blau Hall. The
WiFi project will fund WiFi Access Point hardware and installation. Completion deadline extended due to state of contruction and need to cable some additional locations.)
22 98
LANE HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
11 34
LAWYERS CLUB AND CHARLES T MUNGER RESIDENCES University Housing -- Substantial/Full Upgrade Complete
(Upgraded along with the John P Cook Residence)
65 79
LIBERTY CENTRE VP Research -- Infrastructure Design Underway 2 --
LIFE SCIENCES INSTITUTE BUILDING LSI Leslie Williamson Substantial/Full Upgrade Complete 28 129
LITERATURE SCIENCE AND THE ARTS College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade.
Full upgrade completed in March 2016.)
37 86
LITTLE CLARENCE COOK SCIENCE BLD College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 2/17/16)
57 133
LORCH HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade completed in June 2016 )
47 79
LSA ADMINISTRATION ANNEX College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete 0 15
MADELON LOUISA STOCKWELL HALL University Housing Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 6/23/16)
94 196
MADELON POUND HOUSE Student Affairs -- Substantial/Full Upgrade Complete 2 11
MADISON BUILDING B&F - Plant Operations -- Proposed 4 --
MARIE DOROTHY HARTWIG ADMINISTRATION BUILDING Athletics -- Infrastructure Design Underway 11 --
MARTHA COOK BUILDING University Housing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs)
23 77
MARY BUTLER MARKLEY HALL University Housing Dana Farrell Substantial/Full Upgrade Complete 169 409
MASON HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade completed 10/16/15)
52 118
MCKINLEY TOWNE CENTRE II Rackham - Inst for Human Adjustment CO -- Infrastructure Design Underway 4 --
MICHIGAN SQUARE CEW, ISR -- Substantial/Full Upgrade Complete 3 7
MIKE AND MARY WALLACE HOUSE Rackham Knight-Wallace Fellows -- Substantial/Full Upgrade Complete 0 7
MODERN LANGUAGES BUILDING College of Literature, Science and the Arts Leslie Williamson Substantial/Full Upgrade Complete
(Conduit work wrapping up week of 2/15/16. Cabling ongoing with switch and AP installations to begin shortly.)
73 183
MORTIMER E COOLEY BUILDING (COOLEY) College of Engineering -- Substantial/Full Upgrade Complete 31 58
N C GROUNDS STORAGE BUILDING #1 B&F - ITS -- Upgrade Deferred / Denied
(No need for WiFi)
0 --
NAVAL ARCHITECTURE AND MARINE ENGINEERING College of Engineering -- Substantial/Full Upgrade Complete 23 54
NC GROUNDS GARAGE 1 B&F - Plant Operations -- Upgrade Deferred / Denied
(No need for WiFi; used for storing road de-icing materials)
0 --
NEWBERRY HALL (KELSEY MUSEUM) College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
11 37
NEWS SERVICE BUILDING VP Communications - News Service Leslie Williamson Substantial/Full Upgrade Complete 0 10
NORTH CAMPUS CHILLER PLANT B&F - Plant Operations -- Site Survey Underway 0 --
NORTH CAMPUS FACILITIES SERVICES BUILDING B&F - Facilities & Operations -- Site Survey Underway 0 --
NORTH CAMPUS GROUND SVC FACILITY B&F - Plant Operations -- Site Survey Underway 1 --
NORTH CAMPUS GROUND SVC FACILITY ANNEX B&F - Plant Operations -- Site Survey Underway 0 --
NORTH CAMPUS HOUSING SERVICE BLD University Housing -- Proposed 0 --
NORTH CAMPUS SERVICE BLDG #1 B&F - Facilities & Operations -- Site Survey Underway 0 --
NORTH CAMPUS STORAGE BUILDING B&F - Finance -- Site Survey Underway 0 --
NORTH CAMPUS SUPPORT FACILITY B&F - ITS -- Site Survey Underway 0 --
NORTH CAMPUS SWITCH STATION B&F - Plant Operations -- Substantial/Full Upgrade Complete 0 4
NORTH QUADRANGLE RESIDENTIAL AND ACADEMIC COMPLEX School of Information and University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs; *208,092 square feet of academic and dining space was upgraded Summer 2016; the residence hall portion of the building is to be upgraded later next year.)
250 254
NORTHWOOD COMMUNITY CENTER University Housing Michele Corcoran Substantial/Full Upgrade Complete 4 15
NORTHWOOD I, II & III (57 BUILDINGS) University Housing -- Infrastructure Design Underway 365 --
ONE NORTH MAIN B&F - Investment Office -- Proposed 0 --
OXFORD HOUSE - ADELIA CHEEVER RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
3 7
OXFORD HOUSE - ARTHUR AND HAZEL VANDENBERG HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
7 13
OXFORD HOUSE - GEDDES RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
6 12
OXFORD HOUSE - JULIA ESTHER EMANUEL RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
5 7
OXFORD HOUSE - LAUREL HARPER SEELEY HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
11 24
OXFORD HOUSE - MARY ALICE AND LILLIAN GODDARD HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
7 12
OXFORD HOUSE - PAMELA NOBLE RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/16. )
5 7
OXFORD HOUSE PLANT SERVICE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(This building was upgraded along with Oxford Residences. All Oxford Residence buildings upgrades were completed by 4/20/16.)
0 1
PALMER DRIVE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
PELLSTON BIOLOGICAL LSA Biological Station -- Construction/Installation Underway 0 --
PERRY BUILDING ISR Dana Farrell Substantial/Full Upgrade Complete 35 63
PHOENIX MEMORIAL PROJECT LABORATORY Office of Vice President for Research -- Substantial/Full Upgrade Complete 22 38
PHYSICAL PROPERTIES BUILDING B&F - Facilities & Operations -- Substantial/Full Upgrade Complete 2 5
PLANT SERVICE BUILDING B&F - Plant Operations -- Infrastructure Design Underway 3 --
PLANT STORAGE BUILDING #1 B&F - Plant Operations -- Infrastructure Design Underway
(Plant Buildings #1008050, #1008051 and #1008052 are used for storage only (they have no occupants); we're not installing wireless in the building but they will be covered by an exterior AP from an adjacent building.)
0 --
PLANT STORAGE BUILDING #2 B&F - Plant Operations -- Infrastructure Design Underway
(Plant Buildings #1008050, #1008051 and #1008052 are used for storage only (they have no occupants); we're not installing wireless in the building but they will be covered by an exterior AP from an adjacent building.)
0 --
PLANT STORAGE BUILDING #3 B&F - Plant Operations -- Infrastructure Design Underway
(Plant Buildings #1008050, #1008051 and #1008052 are used for storage only (they have no occupants; we're not installing wireless in the building but they will be covered by an exterior AP from an adjacent building.)
0 --
RADIATION SCIENCES LABORATORY 1 College of Engineering -- Substantial/Full Upgrade Complete
(Upgraded along with NAME [Building #415])
0 --
RADIATION SCIENCES LABORATORY 2 College of Engineering -- Substantial/Full Upgrade Complete
(Upgraded along with NAME [Building #415])
0 --
ROBBEN W & ALDYTH FLEMING ADMINISTRATION BUILDING. Office of the President -- Substantial/Full Upgrade Complete
(Existing APs were replaced with current models.)
20 27
ROBERT H LURIE ENGINEERING CTR College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 39 57
ROSS SCHOOL OF BUSINESS BUILDING School of Business -- Substantial/Full Upgrade Complete 158 198
SCHOOL OF EDUCATION School of Education Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
65 140
SCHOOL OF INFORMATION NORTH School of Information -- Substantial/Full Upgrade Complete 7 22
SCHOOL OF NURSING BUILDING School of Nursing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
22 143
SCHOOL OF SOCIAL WORK BUILDING School of Social Work -- Substantial/Full Upgrade Complete 51 107
SIMPSON CIRCLE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
SOUTH HALL Law School -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
43 31
SOUTH QUADRANGLE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(A short-term upgrade was completed on 2/12/16. Full upgrade completed Summer 2016.)
99 384
SOUTH STATE COMMONS II B&F - ITS -- Construction/Installation Underway 0 --
SPACE RESEARCH LABORATORY College of Engineering -- Substantial/Full Upgrade Complete 67 111
STAMPS AUDITORIUM School of Music -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
6 6
STANFORD LIPSEY STUDENT PUBLICATIONS BUILDING Office of Student Publications -- Substantial/Full Upgrade Complete 4 12
STEARNS FREDERICK BUILDING School of Music Leslie Williamson Substantial/Full Upgrade Complete
(WiFi project completed summer 2016.)
0 24
STEPHEN M ROSS ACADEMIC CENTER Athletics Leslie Williamson Substantial/Full Upgrade Complete 0 28
TAPPAN HALL College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Building WiFi upgrade completed 8/25/15)
11 27
TAPPAN STREET AUXILIARY BUILDING College of Literature, Science and the Arts Infrastructure Design Underway 7
THAYER ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
THOMPSON ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Proposed --
TRANSPORTATION SERVICES BUILDING B&F - Facilities & Operations -- Construction/Installation Underway 2 --
U-M TRANSPORTATION RESEARCH INST UMTRI Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade. Full building upgrade completed 10/21/2016.)
19 76
UM TRANSPORTATION RESEARCH TESTING BUILDING UMTRI -- Substantial/Full Upgrade Complete
(Quonset building adjacent to UMTRI upgraded at same time as the UMTRI building (#444).)
0 4
UNDERGRADUATE SCIENCE BUILDING College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete 26 83
VARSITY DRIVE BUILDING B&F - Facilities & Operations -- Site Survey Underway 2 --
VERA BAITS II CROSS HOUSE University Housing -- Substantial/Full Upgrade Complete 37 38
VERA BAITS II CONGER HOUSE University Housing -- Substantial/Full Upgrade Complete 28 29
VERA BAITS II THIEME HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete 21 22
VERA II BAITS COMAN HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete 44 52
WALTER E LAY AUTOMOTIVE ENGINEERING LABORATORY College of Engineering -- Substantial/Full Upgrade Complete 22 56
WEISER HALL (DENNISON BUILDING) College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade complete in low rise portion of the building
Construction project will upgrade the high rise portion of the building
WiFi project will upgrade the low rise portion of the building
)
70 35
WEST HALL College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
59 146
WILLIAM D REVELLI BAND REHEARSAL HALL School of Music Leslie Williamson Substantial/Full Upgrade Complete 0 19
WILLIAM L CLEMENTS LIBRARY (CLEMENTS) Clements Library Dana Farrell Substantial/Full Upgrade Complete
(Upgrade funded by construction project
WiFi project funding additional APs required due to new WiFi design standard)
0 18
WILLIAM MONROE TROTTER HOUSE Student Affairs -- Infrastructure Design Underway 5 --
WILLIAM W COOK LEGAL RESEARCH LIBRARY Law School Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
41 136
WOLVERINE TOWER Business & Finance -- Infrastructure Design Underway 0 --
WYLY SAM HALL School of Business -- Substantial/Full Upgrade Complete 31 57