Building Status

Buildingsort descending Unit(s) in Building Project Manager Status APs Before APs After
1027 EAST HURON BUILDING VP for Development -- Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 9/14/2017.)
0 8
1032 GREENE BUILDING B&F - Plant Operations -- Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 9/19/2017.)
0 3
1580 ELLSWORTH ROAD University Library Michele Corcoran Infrastructure Design Underway 0 --
202 SOUTH THAYER BUILDING College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 2/19/2016.)
28 41
214 S STATE ST Graham Environ. Sustain. Inst. -- Substantial/Full Upgrade Complete 3 4
300 N INGALLS BUILDING UMHS Building Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
7 77
305 W LIBERTY College of Architecture & Urban Planning -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 2/15/2018.)
0 6
306 S STATE School of Art and Design -- Upgrade Deferred / Denied
(U-M no longer occupies this building)
0 --
523 SOUTH DIVISION BUILDING Office of Budget & Planning Dana Farrell Construction/Installation Underway 0 --
555 SOUTH FOREST BUILDING College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 9/21/2017.)
3 12
625 E LIBERTY STREET Graham Environ. Sustain. Inst. -- Substantial/Full Upgrade Complete 1 3
715 E HURON Ctr for Inst Diversity -- Upgrade Deferred / Denied
(U-M no longer occupies this building)
--
717 E HURON Ctr for Inst Diversity -- Upgrade Deferred / Denied
(U-M no longer occupies this building)
0 --
ADMINISTRATIVE SERVICES B&F - ITS Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/9/2017.)
22 28
AERO ENG LAB PUMPING STATION College of Engineering -- Substantial/Full Upgrade Complete
(WiFi upgrade substantially completed by 6/22/2017.)
0 2
AERO ENG POWER PLANT College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Completed as part of Gorguze WiFi upgrade)
0 --
AEROSPACE ENGINEERING LAB PLASMA RESEARCH College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Upgraded at same time as the Gorguze Family Laboratory)
0 7
AEROSPACE ENGINEERING LAB PROPULSION LAB College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Upgraded at same time as the Gorguze Family Laboratory)
0 7
AEROSPACE ENGINEERING LAB WIND TUNNEL LAB College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Upgraded at same time as the Gorguze Family Laboratory)
0 9
ALICE CROCKER LLOYD HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Upgrade substantially completed as of 6/24/2016.)
65 151
ALUMNI MEMORIAL HALL (MUSEUM OF ART) Museum of Art Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade included replacing existing APs with current Cisco models and reinforcing where able considering access, security and aesthetics. Upgrade completed 8/22/16.)
28 28
ANGELL HALL AUDITORIUMS College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade completed during week of 12/7/2015.)
12 28
ANGELL JAMES B HALL AND TISCH HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 11/5/2015.)
54 125
ANN AND ROBERT H LURIE BIOMEDICAL ENGINEERING BLD College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 3/22/2016.)
25 42
ANN AND ROBERT H LURIE TOWER College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 9/27/2017.)
0 2
ANN STREET PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway 6 --
ARBOR LAKES 1 B&F - ITS Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/22/2017.)
0 28
ARBOR LAKES 2 B&F - ITS Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/22/2017.)
0 40
ARBOR LAKES 3 B&F - ITS Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/22/2017.)
0 51
ARGUS BUILDING I VP Communications - Michigan Creative & Radio -- Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 10/4/2017.)
0 20
ARGUS BUILDING II B&F Risk Management -- Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 11/15/2016.)
0 6
ART & ARCHITECTURE BUILDING School of Art / CA&UP Leslie Williamson Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 1/15/2016.)
64 133
AUXILIARY SERVICES BUILDING 1 B&F - Print Copy Mail Administration -- Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 7/27/2017.)
7 38
AUXILIARY SERVICES BUILDING 2 B&F - Plant Operations -- Substantial/Full Upgrade Complete
(Upgraded with Aux Services Building 1 [#2501]; substantially completed 7/27/2017.)
0 1
BAITS VERA II ZIWET HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Baits II residence halls' WiFi upgrades substantially completed 8/23/2017.)
29 31
BETSY BARBOUR HOUSE University Housing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
12 57
BOB AND BETTY BEYSTER BUILDING College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade completed 5/19/2016.)
58 79
BONISTEEL INTERDISCIPLINARY RESEARCH BUILDING College of Engineering -- Substantial/Full Upgrade Complete 8 9
BOYER BUILDING B&F - ITS Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 9/15/2017.)
6 8
BURNHAM HOUSE Academic & Faculty Affairs -- Infrastructure Design Underway 0 --
BURTON MEMORIAL TOWER School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
9 26
BUSINESS ADMIN EXECUTIVE DORM School of Business Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed by 10/13/2017.)
21 76
CARL A GERSTACKER BUILDING College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 24 51
CARVER BUILDING - 506 E Liberty IRLEE -- Substantial/Full Upgrade Complete 2 10
CATHERINE ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway --
CENTRAL CAMPUS REC BLD STORAGE FACILITY Rec Sports -- Upgrade Deferred / Denied
(No need for WiFi)
0 --
CENTRAL POWER PLANT B&F - Plant Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 1/18/2018.)
0 65
CHARLES R JR WALGREEN DRAMA CENTER School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
23 62
CHEMISTRY & DOW WILLARD H LABORATORY College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 1/6/2016.)
163 382
CHRYSLER CENTER CONTINUING ENGINEERING EDUCATION College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 11/25/2015.)
19 45
CHURCH ST PARKING STRUCTURE Univ Parking Svcs-Central Camp Michele Corcoran Infrastructure Design Underway --
COLISEUM Rec Sports Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/19/2017.)
0 14
COLLEGE OF PHARMACY BUILDING College of Pharmacy Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 2/3/2016.)
5 44
COMMUNITY DENTISTRY School of Dentistry Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 8/16/17.)
1 7
COMPUTER EXECUTIVE EDUCATION BLD School of Business Leslie Williamson Substantial/Full Upgrade Complete
(To be completed as part of construction project for Blau Hall. The
WiFi project will fund WiFi Access Point hardware and installation. Completion deadline extended due to state of contruction and need to cable some additional locations.)
18 74
COUZENS HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade completed 6/28/2016.)
81 212
CRAM PLACE COMMUNITY CENTER University Housing Michele Corcoran Construction/Installation Underway 2 --
DANA SAMUEL TRASK BUILDING SNRE Dana Farrell Substantial/Full Upgrade Complete
(Meru APs were replaced with new Cisco APs prior to full building upgrade completed in June 2016. )
47 97
DANCE BUILDING School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Completed in 2015 along with CCRB as part of Public Building WiFi Project.)
0 6
DENTAL BLDG AND W K KELLOGG FOUNDATION INSTITUTE School of Dentistry Leslie Williamson Substantial/Full Upgrade Complete
(Project team worked with School of Dentistry staff to plan to upgrade areas not expected to be impacted by construction project.
Meru APs replaced with new Cisco APs prior to full building upgrade. Full building upgrade substantially completed 7/7/17.)
279 317
DETROIT OBSERVATORY Academic & Faculty Affairs Dana Farrell Substantial/Full Upgrade Complete 2 3
EARL V MOORE BLDG School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Priority areas were upgraded in Summer 2016. These included the 1st floor practice rooms, auditoriums and 3rd floor faculty offices. Upgrade work on the remaining portions of the building was substantially completed on 9/27/16.)
17 145
EAST HALL College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
113 260
EAST QUADRANGLE University Housing -- Infrastructure Design Underway 165 --
EDWARD HENRY KRAUS BUILDING College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(Kinesiology & LSA will continue to use the building until fall 2017; at that time they will spend 6 to 8 months preparing for a full renovation of the building. Kinesiology is planning to include the WiFi implementation under the construction project, which is tentatively scheduled for completion late 2020 to early 2021. The Campus WiFi Upgrade Project replaced aging infrastructure (existing Meru APs were replaced with new Cisco APs) and key areas of the building were reinforced 7/14/2016. )
85 90
ELECTRICAL ENGINEERING AND COMPUTER SCIENCE BLD College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade completed 6/1/2016.)
96 189
ELIZA M MOSHER HALL & MYRA B JORDAN HALL (MoJo) University Housing Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 6/20/2016.)
117 182
ENGINEERING RESEARCH BUILDING 1 College of Engineering Dana Farrell Substantial/Full Upgrade Complete 28 42
ENGINEERING RESEARCH BUILDING 2 College of Engineering Dana Farrell Substantial/Full Upgrade Complete 24 36
ENGINEERING RESEARCH SUPPORT BLD College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Upgraded along with Auxiliary Services buildings [#2501 & #2502]; upgrades substantially completed 7/27/2017.)
0 1
ENVIRONMENTAL AND WATER RESOURCES ENGINEERING BL College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 18 36
FACILITIES SERVICES BUILDING A B&F - Plant Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/5/2017.)
5 40
FACILITIES SERVICES BUILDING B B&F - Plant Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/5/2017.)
9 40
FACILITIES SERVICES BUILDING C B&F - Plant Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/5/2017.)
3 40
FIRE SERV INSTR RES CENTER B&F - Facilities & Operations -- Upgrade Deferred / Denied
(Fire Station #5 for city of Ann Arbor; no U-M staff officed here)
0 --
FLETCHER HALL University Housing Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 2/19/2016.)
8 19
FLETCHER ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway --
FORD NUCLEAR REACTOR College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade substantially completed by 4/17/2017.)
0 23
FOREST AVE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Upgrade Deferred / Denied
(U-M has rights to parking spaces, but the City operates and maintains the facility.)
--
FRANCIS THOMAS JR PUBLIC HEALTH (SPH II) School of Public Health Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
44 207
FRANCOIS-XAVIER BAGNOUD BUILDING (FXB) College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 2/13/2016.)
39 69
GALLERIA BUILDING Provost's Office - ADVANCE -- Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 5/4/2017.)
0 9
GEORGE GRANGER BROWN MEMORIAL LABORATORIES (G G BROWN) College of Engineering -- Substantial/Full Upgrade Complete
(Completion of upgrade dependent on building projects.)
78 127
GLEN AVE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway --
GLENN E SCHEMBECHLER HALL Athletics Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 1/24/2018.)
7 50
GORGUZE FAMILY LABORATORY College of Engineering -- Substantial/Full Upgrade Complete
(Building upgrade was substantially completed by 11/10/2016.)
31 27
HAMILTON SQUARE Confucius Institute -- Substantial/Full Upgrade Complete 0 4
HARRISON M RANDALL LABORATORY College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade; the number of access points nearly doubled during the upgrade due to building requirements.)
57 155
HAVEN HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 11/5/2015.)
34 79
HEALTH MANAGEMENT RESEARCH School of Kinesiology Leslie Williamson Upgrade Deferred / Denied
(Upgrade on indefinite hold due to changes at HMRC)
0 --
HELEN H NEWBERRY RESIDENCE University Housing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
9 59
HENDERSON HOUSE University Housing -- Infrastructure Design Complete 8 --
HENRY FRIEZE VAUGHAN PUBLIC HEALTH BUILDING (SPH I) School of Public Health Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
78 122
HERBERT H DOW BUILDING (DOW) College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 2/9/2016.)
36 95
HILL ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway --
HOOVER ANNEX B&F - Facilities & Operations Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 11/10/2017.)
0 2
HOOVER AVE HEATING PLANT B&F - Plant Operations -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/10/2017.)
0 3
HURON BANK (777 N. University Ave) School of Information -- Substantial/Full Upgrade Complete
(Upgrade completed as part of SI move-in activities)
0 2
HUTCHINS HALL Law School Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade completed in June 2016.)
48 96
INDUSTRIAL AND OPERATIONS ENGINEERING BUILDING College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 55 61
INSTITUTE FOR SOCIAL RESEARCH ISR Dana Farrell Substantial/Full Upgrade Complete 146 172
INSTITUTE OF CONTINUING LEGAL ED Continuing Legal Education Ins -- Substantial/Full Upgrade Complete 3 9
JAMES AND ANNE DUDERSTADT CENTER University Library Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade completed during week of 12/7/2015.)
43 125
JOAN & SANFORD WEILL HALL (FORD SCHOOL) School of Public Policy Dana Farrell Substantial/Full Upgrade Complete
(Building upgrade substantially completed 8/30/2016.)
39 57
JOHN P COOK BUILDING University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Upgraded along with the Lawyers Club and Charles T Munger Residence)
27 57
JOHN P WEIDENBACH HALL Athletics Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 2/2/2018.)
12 13
JOSEPH A & MARGUERITE K BURSLEY HALL University Housing Dana Farrell Substantial/Full Upgrade Complete
(Full upgrade was completed Summer 2016.)
216 318
KINESIOLOGY BUILDING School of Kinesiology Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
19 39
KRESGE BUSINESS ADMIN LIBRARY School of Business Leslie Williamson Substantial/Full Upgrade Complete
(To be completed as part of construction project for Blau Hall. The
WiFi project will fund WiFi Access Point hardware and installation. Completion deadline extended due to state of contruction and need to cable some additional locations.)
22 98
LANE HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade. Full building upgrade completed 9/30/2016.)
11 34
LAWYERS CLUB AND CHARLES T MUNGER RESIDENCES University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Upgraded along with the John P Cook Residence)
65 79
LIBERTY CENTRE VP Research Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/2/2017.)
2 9
LIFE SCIENCES INSTITUTE BUILDING LSI Leslie Williamson Substantial/Full Upgrade Complete 28 129
LITERATURE SCIENCE AND THE ARTS College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade.
Full upgrade completed in March 2016.)
37 86
LITTLE CLARENCE COOK SCIENCE BLD College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 2/17/2016.)
57 133
LORCH HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs were replaced with new Cisco APs prior to full building upgrade completed in June 2016. )
47 79
LSA ADMINISTRATION ANNEX College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 9/20/2017.)
0 15
MADELON LOUISA STOCKWELL HALL University Housing Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade completed 6/23/2016.)
94 196
MADELON POUND HOUSE Student Affairs Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 9/8/17.)
2 11
MADISON BUILDING B&F - Plant Operations Leslie Williamson Substantial/Full Upgrade Complete 4 12
MARIE DOROTHY HARTWIG ADMINISTRATION BUILDING Athletics Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/7/2017.)
11 15
MARTHA COOK BUILDING University Housing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade.)
23 77
MARY BUTLER MARKLEY HALL University Housing Dana Farrell Substantial/Full Upgrade Complete
(Building upgrade substantially completed 8/23/2016.)
169 409
MASON HALL College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(Building WiFi upgrade substatntially completed 10/16/2015.)
52 118
MCKINLEY TOWNE CENTRE II Rackham - Inst for Human Adjustment CO Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/12/2017.)
4 14
MICHIGAN SQUARE CEW, ISR Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 9/13/2017.)
3 7
MIKE AND MARY WALLACE HOUSE Rackham Knight-Wallace Fellows Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade substantially completed by 9/12/2017.)
0 7
MODERN LANGUAGES BUILDING College of Literature, Science and the Arts Leslie Williamson Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 3/25/2016.)
73 183
MORTIMER E COOLEY BUILDING (COOLEY) College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 6/29/17.)
31 58
N C GROUNDS STORAGE BUILDING #1 B&F - ITS -- Upgrade Deferred / Denied
(No need for WiFi)
0 --
NAVAL ARCHITECTURE AND MARINE ENGINEERING College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 23 54
NC GROUNDS GARAGE 1 B&F - Plant Operations -- Upgrade Deferred / Denied
(No need for WiFi; used for storing road de-icing materials)
0 --
NEWBERRY HALL (KELSEY MUSEUM) College of Literature, Science and the Arts Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade. Building upgrade was substantially completed 10/17/2017.)
11 37
NEWS SERVICE BUILDING VP Communications - News Service Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 11/11/2016.)
0 10
NORTH CAMPUS CHILLER PLANT B&F - Plant Operations -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 1/29/2018.)
0 4
NORTH CAMPUS FACILITIES SERVICES BUILDING B&F - Facilities & Operations -- Substantial/Full Upgrade Complete 0 17
NORTH CAMPUS GROUND SVC FACILITY B&F - Plant Operations -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 3/26/2018.)
1 11
NORTH CAMPUS GROUND SVC FACILITY ANNEX B&F - Plant Operations -- Upgrade Deferred / Denied 0 --
NORTH CAMPUS HOUSING SERVICE BLD University Housing -- Infrastructure Design Underway --
NORTH CAMPUS SERVICE BLDG #1 B&F - Facilities & Operations -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 2/7/2018.)
0 12
NORTH CAMPUS STORAGE BUILDING B&F - Finance -- Construction/Installation Underway
(AKA Property Dispo)
0 --
NORTH CAMPUS SUPPORT FACILITY B&F - ITS Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/15/2017.)
0 2
NORTH CAMPUS SWITCH STATION B&F - Plant Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 6/15/2017.)
0 4
NORTH QUADRANGLE RESIDENTIAL AND ACADEMIC COMPLEX School of Information and University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs; *208,092 square feet of academic and dining space was upgraded Summer 2016; the residence hall portion of the building is to be upgraded later next year.)
250 254
NORTHWOOD COMMUNITY CENTER University Housing Michele Corcoran Substantial/Full Upgrade Complete 4 15
NORTHWOOD I, II & III (57 BUILDINGS) University Housing Michele Corcoran Construction/Installation Underway 365 220
ONE NORTH MAIN B&F - Investment Office Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/8/2017.)
0 3
OXFORD HOUSE - ADELIA CHEEVER RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
3 7
OXFORD HOUSE - ARTHUR AND HAZEL VANDENBERG HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
7 13
OXFORD HOUSE - GEDDES RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
6 12
OXFORD HOUSE - JULIA ESTHER EMANUEL RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
5 7
OXFORD HOUSE - LAUREL HARPER SEELEY HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
11 24
OXFORD HOUSE - MARY ALICE AND LILLIAN GODDARD HALL University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
7 12
OXFORD HOUSE - PAMELA NOBLE RESIDENCE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(All Oxford Residence buildings upgrades were completed by 4/20/2016. )
5 7
OXFORD HOUSE PLANT SERVICE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(This building was upgraded along with Oxford Residences. All Oxford Residence buildings upgrades were completed by 4/20/2016.)
0 1
PALMER DRIVE PARKING STRUCTURE Univ Parking Svcs-Central Camp Leslie Williamson Infrastructure Design Underway --
PELLSTON BIOLOGICAL LSA Biological Station Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade substantially completed by 10/23/2017.)
0 36
PERRY BUILDING ISR Dana Farrell Substantial/Full Upgrade Complete
(Building upgrade was substantially completed 10/4/2016.)
35 63
PHOENIX MEMORIAL PROJECT LABORATORY Office of Vice President for Research Dana Farrell Substantial/Full Upgrade Complete 22 38
PHYSICAL PROPERTIES BUILDING B&F - Facilities & Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 9/20/2017.)
2 5
PLANT SERVICE BUILDING B&F - Plant Operations Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/3/2017.)
3 11
PLANT STORAGE BUILDING #1 B&F - Plant Operations -- Substantial/Full Upgrade Complete
(Plant Buildings #1008050, #1008051 and #1008052 are used for storage only (they have no occupants); we're not installing wireless in the building but they will be covered by an exterior AP from an adjacent building.)
0 --
PLANT STORAGE BUILDING #2 B&F - Plant Operations -- Substantial/Full Upgrade Complete
(Plant Buildings #1008050, #1008051 and #1008052 are used for storage only (they have no occupants); we're not installing wireless in the building but they will be covered by an exterior AP from an adjacent building.)
0 --
PLANT STORAGE BUILDING #3 B&F - Plant Operations -- Substantial/Full Upgrade Complete
(Plant Buildings #1008050, #1008051 and #1008052 are used for storage only (they have no occupants; we're not installing wireless in the building but they will be covered by an exterior AP from an adjacent building.)
0 --
RADIATION SCIENCES LABORATORY 1 College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Upgraded along with NAME [Building #415])
0 --
RADIATION SCIENCES LABORATORY 2 College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Upgraded along with NAME [Building #415])
0 --
ROBBEN W & ALDYTH FLEMING ADMINISTRATION BUILDING. Office of the President Leslie Williamson Substantial/Full Upgrade Complete
(Existing APs were replaced with current Cisco models and one additional AP was installed in the Regents Room. Upgrade was completed on 10/7/2017.)
20 27
ROBERT H LURIE ENGINEERING CTR College of Engineering Michele Corcoran Substantial/Full Upgrade Complete 39 57
ROSS SCHOOL OF BUSINESS BUILDING School of Business Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 7/7/17.)
158 198
SCHOOL OF EDUCATION School of Education Michele Corcoran Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
65 140
SCHOOL OF INFORMATION NORTH School of Information Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 2/8/17.)
7 22
SCHOOL OF NURSING BUILDING School of Nursing Dana Farrell Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade.
Full upgrade completed in March 2016.)
22 143
SCHOOL OF SOCIAL WORK BUILDING School of Social Work Dana Farrell Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 6/15/17.)
51 107
SIMPSON CIRCLE PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway --
SOUTH HALL Law School -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
43 31
SOUTH QUADRANGLE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(A short-term upgrade was completed on 2/12/16. Full upgrade completed Summer 2016.)
99 384
SOUTH STATE COMMONS II B&F - ITS Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/8/2017.)
0 11
SPACE RESEARCH LABORATORY College of Engineering Michele Corcoran Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 8/29/17.)
67 111
STAMPS AUDITORIUM School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
6 6
STANFORD LIPSEY STUDENT PUBLICATIONS BUILDING Office of Student Publications Leslie Williamson Substantial/Full Upgrade Complete
(Building upgrade was substantially completed 9/7/2016.)
4 12
STEARNS FREDERICK BUILDING School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Building upgrade substantially completed 8/10/2016.)
0 24
STEPHEN M ROSS ACADEMIC CENTER Athletics Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 9/20/2017.)
0 28
TAPPAN HALL College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 1/7/2016.)
11 27
TAPPAN STREET AUXILIARY BUILDING College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 12/5/2017.)
7
THAYER ST PARKING STRUCTURE Univ Parking Svcs-Central Camp -- Infrastructure Design Underway --
THOMPSON ST PARKING STRUCTURE Univ Parking Svcs-Central Camp Dana Farrell Infrastructure Design Underway --
TRANSPORTATION SERVICES BUILDING B&F - Facilities & Operations -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/17/2017.)
2 --
TRAVERWOOD College of Engineering Michele Corcoran Conceptually Approved by Provost's Office 2 --
U-M TRANSPORTATION RESEARCH INST UMTRI Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade. Full building upgrade completed 10/21/2016.)
19 76
UM TRANSPORTATION RESEARCH TESTING BUILDING UMTRI -- Substantial/Full Upgrade Complete
(Quonset building adjacent to UMTRI upgraded at same time as the UMTRI building (#444).)
0 4
UNDERGRADUATE SCIENCE BUILDING College of Literature, Science and the Arts Dana Farrell Substantial/Full Upgrade Complete
(Building WiFi upgrade substantially completed 1/6/2016.)
26 83
VARSITY DRIVE BUILDING B&F - Facilities & Operations -- Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 3/23/2018.)
2 58
VERA BAITS II CROSS HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Baits II residence halls' WiFi upgrades substantially completed 8/23/2017.)
37 38
VERA BAITS II CONGER HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Baits II residence halls' WiFi upgrades substantially completed 8/23/2017.)
28 29
VERA BAITS II THIEME HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Baits II residence halls' WiFi upgrades substantially completed 8/23/2017.)
21 22
VERA II BAITS COMAN HOUSE University Housing Leslie Williamson Substantial/Full Upgrade Complete
(Baits II residence halls' WiFi upgrades substantially completed 8/23/2017.)
44 52
WALTER E LAY AUTOMOTIVE ENGINEERING LABORATORY College of Engineering Leslie Williamson Substantial/Full Upgrade Complete 22 56
WEISER HALL (DENNISON BUILDING) College of Literature, Science and the Arts Michele Corcoran Substantial/Full Upgrade Complete
(WiFi upgrade complete in low rise portion of the building
Construction project will upgrade the high rise portion of the building
WiFi project will upgrade the low rise portion of the building
)
70 35
WEST HALL College of Literature, Science and the Arts -- Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade)
59 146
WILLIAM D REVELLI BAND REHEARSAL HALL School of Music Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed 5/19/2016.)
0 19
WILLIAM L CLEMENTS LIBRARY (CLEMENTS) Clements Library Dana Farrell Substantial/Full Upgrade Complete
(WiFi upgrade funded by construction project.
WiFi project funding provided additional APs required due to new WiFi design standard.)
0 18
WILLIAM MONROE TROTTER HOUSE Student Affairs Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 11/14/2017.)
5 10
WILLIAM W COOK LEGAL RESEARCH LIBRARY Law School Leslie Williamson Substantial/Full Upgrade Complete
(Meru APs replaced with new Cisco APs prior to full building upgrade.
Full upgrade substantially completed in March 2016.)
41 136
WOLVERINE TOWER Business & Finance Leslie Williamson Substantial/Full Upgrade Complete
(WiFi upgrade was substantially completed 2/14/2018.)
32 147
WYLY SAM HALL School of Business Leslie Williamson Substantial/Full Upgrade Complete
(Full building upgrade substantially completed by 10/13/2017.)
31 57